Scaffold Kit 4 – 20′ High × 10′ Long × 5′ Wide with Levelers
Heavy-Duty Stationary Scaffold Tower | Service Rentals & Supplies Hawaiʻi
The Scaffold Kit 4 – 20′ High × 10′ Long × 5′ Wide with Levelers is a heavy-duty stationary scaffold system designed for contractors who need high-elevation access, a large working platform, and adjustable leveling capability. Comparable 20′ stationary scaffold towers use adjustable level jacks, heavy-duty steel frames, cross braces, platforms, and upper guardrail systems. 20′ Deluxe Stationary Scaffold Tower [scaffoldmart.com], [scaffoldssupply.com]
The approximately 20-foot-high × 10-foot-long × 5-foot-wide configuration provides a substantial work area for commercial construction, painting, drywall installation, electrical work, stucco, siding, façade work, building repairs, high-ceiling projects, remodeling, and facility maintenance.
Adjustable scaffold levelers allow individual legs to be adjusted within the manufacturer’s approved range, helping crews establish a level and plumb scaffold on properly prepared supporting surfaces. Comparable commercial scaffold towers use adjustable screw jacks with base plates for stationary installations. 20′ Non-Rolling Scaffold Tower with Adjustable Jacks [scaffoldssupply.com]
Service Rentals & Supplies offers scaffold rentals throughout Hawaiʻi, including Oʻahu, Maui, Big Island, Kauaʻi, Molokaʻi, and Lānaʻi. We support contractors, painters, electricians, drywall crews, maintenance companies, hotels, resorts, commercial facilities, and property managers in Honolulu, Kapolei, Pearl City, Kāneʻohe, Kahului, Wailuku, Lahaina, Kīhei, Kona, Hilo, Waimea, Līhuʻe, Kapaʻa, Poʻipū, Kaunakakai, and Lānaʻi City.
Whether you’re searching for a 20′ scaffold with levelers on Oʻahu, working on commercial construction in Honolulu or Kapolei, completing maintenance or renovation work in Kahului or Wailuku on Maui, working in Kona or Hilo on the Big Island, or need elevated scaffold access in Līhuʻe or Kapaʻa on Kauaʻi, Service Rentals & Supplies can help provide the appropriate scaffold configuration for your project.
Key Features
- 20′ high stationary scaffold configuration
- Approximately 10′ long × 5′ wide
- Large elevated working platform
- Adjustable leveling jacks with base plates
- Heavy-duty steel scaffold frames
- Cross/diagonal bracing for stability
- Modular stacked-frame construction
- Upper guardrail-compatible configuration
- Individual leg adjustment
- Outrigger, tie, and stabilization compatibility as required
- Designed for professional commercial and construction applications
- Ideal where a stationary scaffold is preferred over a rolling tower
Typical Specifications
| Specification | Detail |
|---|---|
| Rental Item | Scaffold Kit 4 |
| Equipment Type | Stationary Frame Scaffold Tower |
| Height | Approximately 20′ |
| Length | Approximately 10′ |
| Width | Approximately 5′ |
| Frame Construction | Heavy-Duty Steel |
| Base | Adjustable Leveling Jacks with Base Plates |
| Bracing | Cross / Diagonal Bracing |
| Platform | Scaffold Planks / Decking |
| Guardrails | Upper Guardrail System, configuration dependent |
| Stabilization | Ties / Braces / Outriggers as Required |
| Mobility | Stationary |
| Primary Uses | Construction, Painting, Electrical & Maintenance |
Ideal For
- Commercial construction
- Interior and exterior painting
- Drywall installation and finishing
- Electrical installation
- Lighting and ceiling work
- Stucco and plaster work
- Siding and façade installation
- Building repairs
- Commercial renovations
- Hotel and resort maintenance
- Warehouse and industrial maintenance
- Property management
- Facility maintenance
- High-ceiling work
- Residential and commercial remodeling
⚠️ Scaffold Safety Warning
At a 20-foot scaffold height, proper erection, leveling, bracing, guarding, and stabilization are especially important.
- Scaffold must be completely assembled and inspected before use.
- Use only compatible frames, braces, decking, levelers, guardrails, pins, outriggers, ties, and accessories.
- Adjustable levelers must remain within the manufacturer’s approved adjustment range.
- The completed scaffold must be level, plumb, adequately supported, and properly braced.
- Never use bricks, blocks, loose lumber, pallets, or makeshift materials underneath the scaffold to gain additional height.
- Never exceed the rated capacity of the actual scaffold configuration.
- Install all required guardrails, toe boards, outriggers, ties, guys, braces, and other stabilization components.
- Keep the platform clear of unnecessary materials and trip hazards.
- Maintain safe clearance from electrical equipment and overhead hazards.
- A competent person should inspect the completed scaffold before use and after alterations.
- Always follow manufacturer instructions and applicable workplace safety requirements.
Service Rentals & Supplies Disclaimer
Models, specifications, capacities, dimensions, platform sizes, leveling-jack sizes and adjustment ranges, guardrail configurations, bracing, outriggers, ties, included components, colors, features, and product pictures may vary between manufacturers, models, and individual rental units. Photos are for reference and may not represent the exact equipment supplied. Please call our office if you have any questions or need exact specifications, included components, compatibility, configuration, or availability for your job.






